Should you paint outside in Mapleton, QLD tomorrow?
Your setup
Tell us what you are using and the verdict, the limits, the hours and the week follow it. We remember your choice on this device.
How the score for tomorrow is made
The score for tomorrow is the score of its best stretch. Each hour is judged on the next 48 hours, so rain that is coming still counts against it. A stretch counts as a window only when it lasts at least 4 hours.
What the score looks at
- Air temperature: at or below 8 °C is a stop for water-based paint, with stricter floors for oil and stain.
- Overnight low: a forecast low at or below 5 °C within 24 hours is a stop, because wet paint is chilled.
- Rain now and within 4 hours: 0.1 mm now or 0.5 mm in the next four hours is a stop.
- Dew: air within 2 °C of the dew point within 2 hours is a stop, since condensation spoils adhesion.
- Heat: air at or above 35 °C is a stop, and sun-warmed walls above 34 °C of air plus warmth lose points.
- Humidity: points come off from 80%, with the full penalty at 95%, and very dry air also costs a little.
- Wind: from 20 km/h points come off, and 40 km/h is a stop for overspray and ladders.