Should you paint outside in Fairfield, OH tomorrow?
Your setup
Tell us what you are using and the verdict, the limits, the hours and the week follow it. We remember your choice on this device.
How the score for tomorrow is made
The score for tomorrow is the score of its best stretch. Each hour is judged on the next 48 hours, and on the 72 hours before it, so rain that is coming still counts against it. A stretch counts as a window only when it lasts at least 4 hours.
What the score looks at
- Air temperature against the label minimum: premium latex lines are typically labelled to 35°F, oil and stain often higher. Below the floor is a stop.
- Forecast low: a low at or below the floor within 24 hours of the job is a stop, because the film needs time to form.
- Dew point margin: labels ask for a surface more than 5°F above the dew point. A margin under 5°F is a stop and 5 to 8°F lowers the score.
- Rain timing: a 50% chance or more within 4 hours of the job is a stop, and a smaller chance out to 12 hours lowers the score.
- Rain behind you: half an inch in the last 24 hours is a stop for wood and masonry (our rule), and rain in the last 72 hours lowers the score.
- Heat and sun: air above 85°F lowers the score, above 100°F is a stop, and estimated sun on the wall adds penalty. Labels say avoid direct sun.
- Humidity and wind: high or very dry air and wind from 10 mph lower the score, and gusts of 25 mph or more are a stop (our judgement).
- Daylight and alerts: only daylight hours count, and an active Wind Advisory or Dense Fog Advisory forces NO.